Solar Installation Timeline: Survey to Commissioning

By the EcoMatch editorial team · Published 10 October 2026 · Updated 10 October 2026 · 8 min read

In short

  • A solar installation generally moves through survey, design, grid notification, installation and commissioning stages.
  • Your installer usually needs to notify the local electricity distribution network before or shortly after installation, depending on system size.
  • Scaffolding, equipment delivery and weather can all affect how long the installation day itself and the lead time beforehand take.
  • You should receive an MCS certificate after commissioning, which you will typically need to apply for the Smart Export Guarantee.

The site survey

The process typically begins with a site survey, either a desktop assessment using satellite and mapping data, a more detailed technical survey carried out in person, or both. During an in-person survey, the installer will usually check your roof's condition, orientation, pitch and any shading, as well as your existing electrical setup, including your consumer unit and meter.

This stage is also when the installer confirms practical details such as access for scaffolding and where the inverter and any battery might be located inside the property.

System design and final quote

Following the survey, the installer produces a system design, specifying panel layout, system size, inverter choice, and estimated generation, along with a final itemised quote. This is a good point to ask any outstanding questions about equipment specification, warranties and what is included, as covered in our guide to comparing solar quotes.

Notifying the electricity network

Before or shortly after installing a solar system, your installer generally needs to notify the local electricity distribution network operator, since connecting generation equipment to the grid is subject to industry standards known as G98 and G99, which cover smaller and larger installations respectively. In plain terms, this is a formal notification and, for some systems, an approval process to make sure the local network can safely accommodate the new connection.

Your installer should handle this process as part of the overall project, but it is worth confirming at the quote stage that this is included, since delays at this step can affect your installation timeline, particularly for larger systems.

Scaffolding and the installation itself

Scaffolding is usually erected a day or so before the installation team arrives, and is needed for safe access to the roof. The installation itself typically involves fitting mounting rails, attaching the panels, running cabling to the inverter location, and connecting the system to your consumer unit.

Installation timelines vary depending on system size and roof complexity, and can be affected by weather conditions, since roof work is generally not carried out in unsafe conditions such as high winds or heavy rain.

Commissioning, certification and SEG

Once installed, the system is commissioned, meaning it is tested and switched on, with the installer checking it operates correctly and safely. You should then receive documentation including an MCS certificate confirming the installation meets the required standard.

With your MCS certificate and system details in hand, you can apply for a Smart Export Guarantee tariff with a participating supplier, as covered in our dedicated SEG guide, allowing you to be paid for electricity your system exports to the grid.

What to expect overall

While every project differs, homeowners can generally expect a period of weeks between the initial enquiry and survey, and the installation taking place, followed by a relatively short installation period itself, often a day or two for a typical domestic system, with commissioning and paperwork following shortly after. Ask your installer for their expected timeline at each stage so you know what to anticipate.

Practical takeaway

Ask your installer for a clear stage-by-stage timeline at the quote stage, including grid notification and expected commissioning date, so you know what to expect before work begins.

Frequently asked questions

How long does a typical solar installation take from start to finish?

Timelines vary by installer and system size, but homeowners can generally expect a period of weeks from enquiry to installation, with the physical installation itself often completed within a day or two.

What is G98 or G99 notification?

These are industry standards covering how generation equipment, including solar panels, connects to the local electricity network. Your installer typically handles this notification or approval process as part of the project.

Do I need to be home during the installation?

Most of the work happens outside or in the location of your consumer unit and inverter, but it is sensible to be available to answer questions and for any final walkthrough with the installer.

What happens after commissioning?

You should receive an MCS certificate and system documentation, which you will typically need to apply for a Smart Export Guarantee tariff with a supplier.

Looking for a solar panels installer?

Free for homeowners. We review your enquiry and, where an approved partner is available for your area, introduce one installer for this service.

Start my free enquiry

Related guides

Free for homeowners · No obligationStart free enquiry